Lake Oroville, California
  • Home
  • Things To Do
    • Boating >
      • Boat in Lake Camping
      • Boating Restrictions on Oroville Area water ways
    • Camping >
      • Camping Location
      • Camping Fee Schedule
      • Dining
      • Lake Oroville Equestrian Camps
    • Fishing >
      • Fishing Lake Oroville
    • Local Hotel Search
    • Bidwell Marina
    • Lime Saddle marina
    • Signature Events
    • Shopping
    • Trails >
      • Trails Galore
      • Hiking Trails
      • Biking Trails
      • Equestrian Trails
      • Take the Tour
      • Explore Adventure
      • Hiking - Safety Tips
  • Visit Oroville
  • Gallery
  • More
    • Area Links
    • Directions
    • F.A.Q
    • Blog
  • Contact
  • Golden Mussel

Blog

Lake Oroville Community Update - September 12

9/12/2023

 
Picture
Picture
Maintenance Work on Main Spillway Set to Begin
​
Starting this week, Oroville-area residents will notice construction staging equipment and materials at Oroville Dam’s main spillway. The Department of Water Resources (DWR) is performing minor routine concrete and sealant repair work on localized areas of the spillway identified during annual inspections.
While the main spillway continues to perform well and operate as designed, periodic concrete and sealant repairs of the spillway are expected due to seasonal temperature variations, spillway releases, and sun exposure.  In 2023, Oroville Dam’s main spillway has passed over 2,370,000 acre-feet of water – approximately 67 percent of the capacity of Lake Oroville – with flows up to 36,000 cubic feet per second this spring.
Construction work is expected to continue through November 15, but is dependent on weather and Oroville Dam operations. DWR will be monitoring reservoir levels and weather forecasts closely and will complete repair work early if spillway releases are required for flood control. The construction contract period extends through 2025, permitting the contractor to complete repairs in future dry seasons should the 2023 construction window be limited. 
Approximately 500 square-feet of total concrete repairs are anticipated, representing less than 0.1 percent of the spillway’s surface. DWR will also be replacing joint sealant at select chute slab and wall joints that wear over time due to the spillway’s environment, and inspecting 51,000 feet of piping that supports the spillway’s improved drainage system.
The spillway was rebuilt to the highest engineering and safety standards with oversight and guidance by the Federal Energy Regulatory Commission (FERC), Division of Safety of Dams (DSOD), and an independent board of consultants. DWR performed a significant amount of inspection and testing throughout construction to verify compliance with project specifications. DWR also provides regular updates to the Oroville Dam Citizens Advisory Commission, a public forum for discussing operations, maintenance, and public safety activities at Oroville Dam and its facilities.


Comments are closed.

    Archives

    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    August 2018
    July 2018
    June 2018

    Categories

    All
    Biking
    Boating
    Camping
    Community Update
    Events
    Feather Fiesta Days
    Hiking
    Points Of Interest
    Recreation
    Trails

    RSS Feed

CONTACT
Lake Oroville website is administered by the Oroville Area Chamber of Commerce in cooperation with the CA Department of Water Resources. To contact us or to order a free information packet about Lake Oroville, please contact us. Phone: 800.655.4653 Email: [email protected]
QUICK ACCESS
Lake Oroville Event Calendar
Take the Tour
Explore Adventure
Safety Tips
© Copyright 2009-2013, All Rights Reserved | Powered  by Chamber Nation   |    Privacy Policy
  • Home
  • Things To Do
    • Boating >
      • Boat in Lake Camping
      • Boating Restrictions on Oroville Area water ways
    • Camping >
      • Camping Location
      • Camping Fee Schedule
      • Dining
      • Lake Oroville Equestrian Camps
    • Fishing >
      • Fishing Lake Oroville
    • Local Hotel Search
    • Bidwell Marina
    • Lime Saddle marina
    • Signature Events
    • Shopping
    • Trails >
      • Trails Galore
      • Hiking Trails
      • Biking Trails
      • Equestrian Trails
      • Take the Tour
      • Explore Adventure
      • Hiking - Safety Tips
  • Visit Oroville
  • Gallery
  • More
    • Area Links
    • Directions
    • F.A.Q
    • Blog
  • Contact
  • Golden Mussel