![]() October 28, 2022 Control Burn at Loafer Creek CAL FIRE, Butte County Fire Department, Plumas National Forest, and partners Department of Water Resources (DWR) and California Department of Parks and Recreation (State Parks) will be continuing their planned control burn on over 200 acres in the Loafer Creek Recreation Area near Lake Oroville. The goal of the control burn is to remove overgrown ladder fuels and dead and dying vegetation and minimize ground fuels to create a more wildfire resistant landscape. Around 116 acres have been treated as of Thursday night and over 95 acres are being targeted in the southwest portion of Loafer Creek. Multiple burn areas are planned beginning Monday, Oct. 31 and through the week, causing some intermittent trail closures in the Loafer Creek Recreation Area. Trail users are advised to be “safety-aware” and obey posted trail closure signage. Control burn activities will take place depending on weather and incident activity in Butte County. Smoke from the activity has been, and may continue to be, visible in the Oroville area. DWR’s Fuel Load Management Plan (FLMP) works to reduce wildfire risk and increase public safety around Lake Oroville. Previous FLMP projects in the Loafer Creek Recreation Area have been identified as contributing to the slowing of the 2020 North Complex Fire as it approached Kelly Ridge, increasing firefighters’ ability to establish a secure fire line, and preventing the fire from progressing. Ongoing management of this critical area remains a high priority for the FLMP. ![]() OROVILLE RADIAL GATES PROJECT DWR and contractor staff successfully reinstalled the gate hoist assembly on Gate #8 at Oroville Dam’s Flood Control Outlet (FCO), or main spillway which will be available and fully operational throughout the flood season. The work was part of a multi-year project to perform maintenance repairs on the eight radial gate hoist assemblies of the FCO as part of the Oroville Radial Gates Maintenance Repair Project. Unico will now begin work on the design and fabrication of a replica hoist that will be installed while subsequent hoists are removed for inspection and full maintenance repairs to address any deficiencies due to wear, age, and serviceability of the equipment. The design and fabrication phase of the project is anticipated to be completed by May 2023. Occurring yearly beginning in 2023, maintenance repairs will be performed on one gate hoist assembly per year during the dry season (May 1 to Oct. 31) using the spare hoist assembly. The project is anticipated to be fully completed for all eight radial gates in 2030. ![]() FLOOD PREPAREDNESS WEEK More than seven million California residents are at risk of flooding, and many don’t realize it. Flooding happens throughout the state; every California county has received a flood-related emergency declaration in the past 20 years and flood events during and after drought conditions are not uncommon. Make sure you are prepared for flood events through these three steps:
OROVILLE DAM CITIZENS ADVISORY COMMISSION The California Natural Resources Agency hosted the 12th Oroville Dam Citizens Advisory Commission meeting Oct. 21 at Southside Community Center in Oroville. In addition to public comment, presentations on inundation maps and new atmospheric river research, and an update on Oroville Dam facility winter operations, the Commission also announced it is collecting comments on the draft 3-year report of the Commission’s activities. Visit the Commission’s report webpage at https://resources.ca.gov/Initiatives/Oroville-Dam-Citizens-Advisory-Commission/Oroville-Dam-Citizens-Advisory-Commission-Report for details. The Citizens Advisory Commission is a forum for questions and feedback from the communities surrounding Oroville Dam. For information on the meeting, please visit https://bit.ly/OrovilleCAC. A transcript of the meeting will be available on this webpage in the coming weeks. ![]() OROVILLE RECREATION The Loafer Point Stage II boat ramp is expected to close the week of Oct. 31 due to falling lake levels. The Bidwell Canyon Stage III boat ramp remains open for boating and for fishing enthusiasts who are finding success at Lake Oroville. The Feather River Fish Hatchery continues to perform spawning, rearing, and stocking activities and is open daily 8 a.m. to 3 p.m. The Fish Barrier Dam Overlook area and underwater viewing window is open sunrise to sunset. DWR and State Parks maintain over 92 miles of trails in the Oroville area, including around the Lake Oroville Visitor Center. Paved trails there and at the North Forebay Day Use Area offer accessible trails with only slight elevation changes. Other trails, such as the Brad Freeman Trail between the Spillway Day Use Area and the Diversion Pool, offer trails with steep elevation changes to challenge hikers and mountain bikers. The Saddle Dam Trailhead has facilities for equestrians, including a large parking area to accommodate horse trailers, water trough, and hitching posts, and easy access to trails designated for hikers and horses. Trails and their permitted uses (hike, bike, horse, multi), day use areas, boat ramps, and other recreation facilities are featured on DWR’s interactive map on DWR’s Lake Oroville Recreation webpage at https://water.ca.gov/What-We-Do/Recreation/Lake-Oroville-Recreation. CURRENT LAKE OPERATIONS The elevation of Oroville’s reservoir is about 682 feet elevation and storage is about 1.12 million acre-feet (MAF), which is 32 percent of its total capacity and 62 percent of historical average. Warmer temperatures are forecast for the weekend, cooling down next week with temperatures dropping into the low-to-upper-60s. The Feather River releases are currently at 2,400 cubic feet per second (cfs) and continue to meet downstream Delta water quality and outflow needs. Flows through the City of Oroville are 650 cfs with 1,750 cfs released from the Thermalito Afterbay Outlet (Outlet) for a total of 2,400 cfs downstream of the Outlet. DWR continues to assess releases to the Feather River daily. The public can track precipitation, snow, reservoir levels, and more at the California Data Exchange Center at www.cdec.water.ca.gov. The Lake Oroville gage station is identified as “ORO”. All data as of midnight 10/27/2022 ![]() California is in its third year of drought conditions. With water conservation now a way of life in California, everyone is encouraged to find ways to save water. See tips, tools, and ideas on the Save Our Water website. Information about real time local hydrological conditions, forecasts, and water conditions is available on DWR’s new website California Water Watch. ![]() October 21, 2022 Flood Preparedness Week More than seven million California residents are at risk of flooding, and many don’t realize it. Flooding happens throughout the state; every California county has received a flood-related emergency declaration in the past 20 years and flood events during and after drought conditions are not uncommon. Make sure you are prepared for flood events through these three steps:
Oroville Dam Citizens Advisory Commission The California Natural Resources Agency hosted its 12th Oroville Dam Citizens Advisory Commission meeting on Oct. 21. The public meeting was held at the Southside Oroville Community Center in Oroville and included a brief update on the development of a report on the Commission’s activities, presentations on inundation maps and new atmospheric river research, and an update on Oroville Dam facility winter operations. Public comments were also provided. Comments are also being collected on the draft 3-year report of the Commission’s activities. Please visit the Commission’s report webpage for details. The Citizens Advisory Commission is a forum for questions and feedback from the communities surrounding Oroville Dam. For information on the meeting, please visit https://bit.ly/OrovilleCAC. A transcript of the meeting will be available on this webpage in the coming weeks. Volunteer Opportunities Available California Climate Action Corps - Community Climate Action Day is taking place on October 29, 2022, in Butte County. This event and celebration is hosted by California Volunteers, Office of the Governor, Community Organized Relief Effort, and Butte County community organizations. More than 100 volunteers will support projects throughout the county focused on urban greening, wildfire resiliency, and organic waste and edible food recovery. California Climate Action Corps ”Community Climate Action Day” provides a great opportunity for persons to serve with other volunteers and get connected with organizations engaged in climate action work year-round. Sign up for a volunteer opportunity today! ![]() OROVILLE RADIAL GATES PROJECT DWR and contractor staff are continuing work on the multi-year project to perform maintenance repairs on the eight radial gate hoist assemblies of Oroville Dam’s Flood Control Outlet (FCO), or main spillway, as part of the Oroville Radial Gates Maintenance Repair Project. In August, contractor Unico removed the gate hoist assembly located above FCO radial gate #8 for inspection, routine maintenance, and reverse engineering to develop design and fabrication drawings for a replica hoist. Work to reinstall the gate hoist assembly began on Oct. 17 so it will be available and fully operational throughout the flood season. This work is anticipated to be accomplished by Oct. 31. Crane operations from the Spillway bridge may be visible to the public. After hoist #8 is re-installed by Unico, Unico will begin work on the design and fabrication of a replica hoist that will be installed while subsequent hoists are removed for inspection and full maintenance repairs to address any deficiencies due to wear, age, and serviceability of the equipment. The design and fabrication phase of the project is anticipated to be completed by May 2023. Occurring yearly beginning in 2023, maintenance repairs will be performed on one gate hoist assembly per year during the dry season (May 1 to Oct. 31) using the spare hoist assembly. The project is anticipated to be fully completed for all eight radial gates in 2030. ![]() CONTROL BURN AT LOAFER CREEK CAL FIRE/Butte County Fire Department and partners DWR and California Department of Parks and Recreation (State Parks) postponed the planned control burn on 163 acres in the Loafer Creek Recreation Area near Lake Oroville. The CAL FIRE Vegetation Management Project’s work to remove overgrown ladder fuels and dead and dying vegetation has been rescheduled for the week of Oct. 24 depending on weather and incident activity in Butte County. Smoke from the activity may be visible around the Oroville area. DWR’s Fuel Load Management Program’s (FLMP) partnership with CAL FIRE and other organizations works to reduce wildfire risk, increase public safety, and enhance forest and watershed health around Lake Oroville. Previous FLMP partnership projects in the Loafer Creek Recreation Area have been identified as contributing to the slowing of the 2020 North Complex Fire as it approached Kelly Ridge, increasing firefighters’ ability to establish a secure fire line and preventing the fire from spreading forward. Ongoing management of this critical area remains a high priority for the FLMP partnership. ![]() OROVILLE RECREATION DWR and State Parks maintain over 92 miles of trails in the Oroville area. Popular with mountain bikers, hikers and equestrians, trails near the Thermalito Diversion Pool can be accessed from Cherokee Road and offer ample opportunity for viewing the local wildlife. Trails along the south side of the Diversion Pool can be accessed from the new trail access parking lot west of the South Feather Powerhouse and accessible from Hyatt Powerplant Road. Trails and their permitted uses (hike, bike, horse, multi), day use areas, boat ramps, and other recreation facilities are featured on DWR’s interactive map on DWR’s Lake Oroville Recreation webpage. California Department of Fish and Wildlife (CDFW) staff at the Feather River Fish Hatchery continue to perform spawning, rearing, and stocking activities for the Chinook salmon returning to the Feather River to finish their life cycle and start a new one. The hatchery is open daily 8 a.m. to 3 p.m. where visitors can watch spawning operations when CDFW staff are working. The Fish Barrier Dam Overlook area and underwater viewing window is open sunrise to sunset. The Loafer Point Stage II and Bidwell Canyon Stage III ramps continue to be open. The Spillway boat ramp and the Lime Saddle boat ramp are closed for the season and will re-open when lake levels rise again from upcoming fall and winter precipitation. Shuttle service to moored boats is available at the Lime Saddle Marina from 8:30 am. to 4 p.m. The Bidwell Canyon Marina will also be open from 8:30 am. to 8 p.m. with shuttle service available during that time. The Lake Oroville Visitor Center is open Tuesday through Thursday 9 a.m. to 5 p.m. CURRENT LAKE OPERATIONS The elevation of Oroville’s reservoir is about 686 feet elevation and storage is about 1.15 million acre-feet (MAF), which is 33 percent of its total capacity and 63 percent of historical average. A fall cool-down is forecasted for the weekend and into next week with temperatures dropping into the low-to-upper-70s. The Feather River releases are currently at 2,400 cubic feet per second (cfs) and continue to meet downstream Delta water quality and outflow needs. Flows through the City of Oroville are 650 cfs with 1,750 cfs released from the Thermalito Afterbay Outlet (Outlet) for a total of 2,400 cfs downstream of the Outlet. DWR continues to assess releases to the Feather River daily. The public can track precipitation, snow, reservoir levels, and more at the California Data Exchange Center at www.cdec.water.ca.gov. The Lake Oroville gage station is identified as “ORO”. All data as of midnight 10/20/2022 ![]() California is in its third year of drought conditions. With water conservation now a way of life in California, everyone is encouraged to find ways to save water. See tips, tools, and ideas on the Save Our Water website. Information about real time local hydrological conditions, forecasts, and water conditions is available on DWR’s new website California Water Watch. Oroville Dam Citizens Advisory Commission The California Natural Resources Agency is hosting its 12th Oroville Dam Citizens Advisory Commission meeting on Oct. 21, 10 a.m. to noon. The public meeting will be held at the Southside Oroville Community Center, located at 2959 Lower Wyandotte Road, Oroville, CA 95966, and will include presentations and public comment. The Commission will receive a brief update on the development of a report on the Commission’s activities, presentations on inundation maps and new atmospheric river research, and an update on Oroville Dam facility winter operations. There also will be time for public input. The Citizens Advisory Commission is a forum for questions and feedback from the communities surrounding Oroville Dam. For information on the meeting, please visit https://bit.ly/OrovilleCAC. ![]() OROVILLE RADIAL GATES PROJECT During the week of Oct. 17, the Department of Water Resources (DWR) and contractor staff will continue work on the multi-year project to perform maintenance repairs on the eight radial gate hoist assemblies of Oroville Dam’s Flood Control Outlet (FCO), or main spillway, as part of the Oroville Radial Gates Maintenance Repair Project. In August, contractor Unico removed the gate hoist assembly located above FCO radial gate #8 for inspection, routine maintenance, and reverse engineering to develop design and fabrication drawings for a replica hoist. Beginning Oct. 17, the gate hoist assembly will be reinstalled to be available and fully operational throughout the flood season. This work is anticipated to be accomplished over the next couple of weeks. Crane operations from the Spillway bridge may be visible to the public. After hoist #8 is re-installed by Unico, Unico will begin work on the design and fabrication of a replica hoist that will be installed while subsequent hoists are removed for inspection and full maintenance repairs to address any deficiencies due to wear, age, and serviceability of the equipment. The design and fabrication phase of the project is anticipated to be completed by May 2023. Occurring yearly beginning in 2023, maintenance repairs will be performed on one gate hoist assembly per year during the dry season (May 1 to Oct. 31) using the spare hoist assembly. The project is anticipated to be fully completed for all eight radial gates in 2030. ![]() Control Burn at Loafer Creek CAL FIRE/Butte County Fire Department will be working with DWR and California Department of Parks and Recreation (State Parks) to conduct a control burn on 163 acres in the Loafer Creek Recreation Area near Lake Oroville. The CAL FIRE Vegetation Management Project’s work to remove overgrown ladder fuels and dead and dying vegetation is scheduled to take place Oct. 17 – 31 depending on weather and incident activity in Butte County. Smoke from the activity may be visible around the Oroville area. DWR’s Fuel Load Management Program’s (FLMP) partnership with CAL FIRE and other organizations works to reduce wildfire risk, increase public safety, and enhance forest and watershed health around Lake Oroville. Previous FLMP partnership projects in the Loafer Creek Recreation Area have been identified as contributing to the slowing of the 2020 North Complex Fire as it approached Kelly Ridge, increasing firefighters’ ability to establish a secure fire line and preventing the fire from spreading forward. Ongoing management of this critical area remains a high priority for the FLMP partnership. Traffic AlertButte County Public Works Department crews will be paving the entrances to Vance Avenue and Palm Avenue near the Oroville Wildlife Area south of the Thermalito Afterbay Monday, Oct. 17 through Thursday, Oct. 20. One-way traffic controls will be in effect and traffic delays should be expected. The department has also performed grading work on Vance Avenue as part of the improvement project. ![]() OROVILLE RECREATION There are newer trails on the north side of the Thermalito Diversion Pool, including sections of the area’s Brad Freeman Trail that have been re-aligned and which switchback up a new hill made from rock and dirt left over from the spillways project. This trail provides beautiful views of the Valley, Table Mountain, and the Diversion Pool where an abundant wealth of wildlife, including bald eagles, osprey, and burrowing owls, can be viewed. Popular with mountain bikers, hikers and equestrians, the Diversion Pool’s trails can be accessed from Cherokee Road. Trails along the south side of the Diversion Pool can be accessed from the new trail access parking lot west of the South Feather Powerhouse and accessible from Hyatt Powerplant Road. Trails and their permitted uses (hike, bike, horse, multi), day use areas, boat ramps, and other recreation facilities are featured on DWR’s interactive map on DWR’s Lake Oroville Recreation webpage. California Department of Fish and Wildlife (CDFW) staff at the Feather River Fish Hatchery continue to perform spawning, rearing, and stocking activities for the chinook salmon returning to the Feather River to finish their life cycle and start a new one. The hatchery is open daily 8 a.m. to 3 p.m. where visitors can watch spawning operations when CDFW staff are working. The Fish Barrier Dam Overlook area and underwater viewing window is open sunrise to sunset. The Loafer Point Stage II and Bidwell Canyon Stage III ramps continue to be open and will remain so for the rest of the season. The Spillway boat ramp and the Lime Saddle boat ramp are closed for the season and will re-open when lake levels rise again from upcoming fall and winter precipitation. Shuttle service to moored boats is available at the Lime Saddle Marina from 8:30 am. to 4 p.m. The Bidwell Canyon Marina will also be open from 8:30 am. to 8 p.m. with shuttle service available during that time. The Lake Oroville Visitor Center is open Tuesday through Thursday 9 a.m. to 5 p.m. CURRENT LAKE OPERATIONSThe elevation of Oroville’s reservoir is about 690 feet elevation and storage is about 1.18 million acre-feet (MAF), which is 34 percent of its total capacity and 64 percent of historical average. A mild cool-down is forecasted for the latter part of the weekend with temperatures dropping into the upper-70s and variable temperatures ranging from the low- to-upper-80s next week. The Feather River releases are currently at 2,400 cubic feet per second (cfs) and continue to meet downstream Delta water quality and outflow needs. Flows through the City of Oroville are 650 cfs with 1,750 cfs released from the Thermalito Afterbay Outlet (Outlet) for a total of 2,400 cfs downstream of the Outlet. DWR continues to assess releases to the Feather River daily. The public can track precipitation, snow, reservoir levels, and more at the California Data Exchange Center at www.cdec.water.ca.gov. The Lake Oroville gage station is identified as “ORO”. All data as of midnight 10/13/2022 ![]() California is in its third year of drought conditions. With water conservation now a way of life in California, everyone is encouraged to find ways to save water. See tips, tools, and ideas on the Save Our Water website. Information about real time local hydrological conditions, forecasts, and water conditions is available on DWR’s new website California Water Watch. |
Archives
May 2023
Categories
All
|